

TICOFRAME

Request a Project Evaluation
Before issuing a structural quote, we conduct a technical analysis of the project to define the appropriate Steel Frame system.
We work on a technical basis, not by approximation.
What do we analyze before quoting?
01
Review of architectural plans
We verified the structural consistency of the design.
02
Load analysis
We evaluate seismic loads, wind, and local conditions.
03
Preliminary definition of the system
Technical proposal of profiles and structural configuration
04
Technical feasibility
Structural recommendations.
Why do an evaluation before quoting?
In Steel Frame, the structural design defines the actual cost of the project.
Quoting without technical analysis generates errors, cost overruns, and rework.
We provide quotes based on prior engineering.

After the evaluation
With the structural evaluation we technically define the project system.
Based on that analysis, we prepared the corresponding structural quote.
Estimated analysis time: 5–7 business days.
What do you receive after the evaluation?
• Preliminary proposal of the Steel Frame system
• Technical basis for formal quotation